Post
by acodispo » Mon Jun 25, 2018 4:50 pm
The main piece of equipment would be a stout timber.
If we can find a screw jack, we'd have the timber cut to a length where we could put the timber on top of the jack, between the floor & ceiling next to the staff, then raise the jack till it's snug.
Without the jack, we'd just cut the timber to about the height of the staff, and just manually wedge it in next to the staff.
Once either of the above is done, tie a rope to the lower end of the staff, and pull hard & fast to drag it out into the hallway.
[f=47]Wilibald "Willie" Whitfoot, F1/T1 (M 12", AC 6, HD 1+2, hp 9/9, L) gambeson+helm, shield+warhammer[/f]
[f=59]Witherun [Agile Hero, MV 12′′, AC 6, HD 4, hp 16, FC 4 men/hero, SV F4, L] hide+helm, shield+dagger or bow[/f]